Shipping traffic for Tuesday, July 24, 2012
DULUTH ENTRY: Morning: Great Lakes Trader, arriving to unload stone and load iron ore pellets; John G. Munson, arriving to unload limestone and load iron ore pellets; American Century, departing with coal
TUESDAY, JULY 24
DULUTH ENTRY
Morning: Great Lakes Trader, arriving to unload stone and load iron ore pellets; John G. Munson, arriving to unload limestone and load iron ore pellets; American Century, departing with coal
Afternoon: Federal Maas, arriving to
SUPERIOR ENTRY
Morning: Algoma Progress, departing with iron ore pellets; Philip R. Clarke, arriving to load iron ore pellets and departing in the afernoon
TWO HARBORS
Morning: Frontenac, arriving to load iron ore pellets
Evening/night: Edgar B. Speer, arriving to load iron ore pellets
For updated information 24 hours a day, call the Boatwatcher’s Hotline at (218) 722-6489.
Source: The U.S. Army Corps of Engineers Lake Superior Maritime Visitors Center in Canal Park. Arrival and departure times are not official and can vary widely.
Tags: shipping traffic, lake superior, two harbors, business, shipping, superior
More from around the web
